Development and implementation of a solution based on modern SENECA Z-PASS2-RT-S controllers with integrated 4G modem and the Yokogawa CI Server SCADA system, including:
- Preparation of technical documentation and installation of equipment in existing cabinets.
- Development of the PLC application.
- Installation of workstations and networking of remote locations via the 4G network.
- Development of the SCADA application for monitoring, control and data archiving.
- Technical support during testing, integration and commissioning of the system.