DCS Control System at the new Wastewater Treatment Plant in Elixir Prahovo factory

Control and Safety Instrumented Systems (DCS & ESD), Designing 2024

Implementation of the project for installation and integration of the DCS system (Yokogawa Centum VP), including:

  • Preparation of technical documentation, delivery and installation of control cabinets for the DCS system.
  • Installation of workstations and network configuration.
  • Development of the DCS application for control of the wastewater treatment plant (logic functions, graphical displays, reports).
  • Technical support during testing, integration and commissioning of the system.
DCS Control System at the new Wastewater Treatment Plant in Elixir Prahovo factory
DCS Control System at the new Wastewater Treatment Plant in Elixir Prahovo factory
DCS Control System at the new Wastewater Treatment Plant in Elixir Prahovo factory
DCS Control System at the new Wastewater Treatment Plant in Elixir Prahovo factory
DCS Control System at the new Wastewater Treatment Plant in Elixir Prahovo factory
DCS Control System at the new Wastewater Treatment Plant in Elixir Prahovo factory